Luxury Bathroom Renovations Brisbane

Bathroom Renovations Brisbane — Built For Quiet Luxury.

From planning to the final silicone bead, we deliver Bathroom Renovations Brisbane with refined finishes, expert craftsmanship, and one clear fixed price.

Licensed & Insured 10-Yr Warranty Fixed Price
4.9 from 120+ Brisbane homeowners
Bathroom Specialists

A Bathroom Renovation Brisbane Built Around The Way You Live.

A bathroom may be the smallest room in the house, but it takes careful planning and expert workmanship to get every detail right. From precise measurements and water-resistant surfaces to proper waterproofing behind the walls, every decision matters. Our bathroom renovation Brisbane services focus on quality craftsmanship, thoughtful design and attention to detail at every stage.

Based in Coopers Plains, we manage the entire renovation process across Brisbane and Logan, including design, strip-out, waterproofing, tiling, installation and finishing. With one project manager, one licensed team and one fixed price agreed upfront, you can enjoy a seamless renovation and a beautifully finished bathroom designed to stand the test of time.

Certified Waterproofing
Fixed-Price Quotes
Licensed & Insured Trades
10-Year Workmanship Warranty
2–3 Week Typical Turnaround
Daily Site Clean-Down
Start Your Bathroom
Completed bathroom renovation with white marble tiling and a glass shower
Close detail of mosaic tiling in a completed bathroom
250+ Bathrooms
Transformed

Most bathroom renovations fail in the places you never see. Ours are built from the substrate up — sheeting replaced rather than patched, falls set to the waste before the screed goes down, membranes certified and photographed at every stage, and tiles laid off a set-out drawn to your specific room rather than started from a convenient corner.

The result is a room that behaves as well as it looks: no ponding water in the shower base, no hollow tiles underfoot, no silicone peeling away from the bath in the second summer. Below is what a standard bathroom from us includes — not as optional extras, but as the baseline for every project we take on.

01

Waterproofing & Membranes

Two-coat certified membrane to AS 3740, taken up the walls and photographed at every stage for your compliance record.

02

Tiling & Stonework

Floor-to-ceiling porcelain, natural stone or feature mosaic, set out from a drawing so cuts land where they should.

03

Custom Vanities & Storage

Australian-made cabinetry built to your millimetres, with soft-close hardware and stone tops that clear the door swing.

04

Heating, Lighting & Tapware

Underfloor heating, IP-rated lighting zones, exhaust that actually clears steam, and WELS-rated tapware in your chosen finish.

Three rooms, three very different briefs.

Bathroom project in Regents Park — Twin vanity, walk-in shower
Bathroom · Regents Park Twin vanity, walk-in shower
Bathroom project in Springwood — Full marble tiling, frameless screen
Bathroom · Springwood Full marble tiling, frameless screen
Bathroom project in Browns Plains — Marble tiling, single vanity
Bathroom · Browns Plains Marble tiling, single vanity
How It Works

Four Steps From
First Call To Handover

01

Consult & Measure

We visit your home, measure the room, check the substrate and talk through how you actually use the space. No cost, no obligation.

02

Design & Fixed Quote

You get a layout, a tile and fixture selection, and one fixed price covering every trade. What you sign is what you pay.

03

Strip-Out & Waterproof

Full strip-out, rough-in, falls set and a certified two-coat membrane — the stage that decides whether the room lasts.

04

Fit-Off & Handover

Tiling, cabinetry, glass and tapware go in, the room is cleaned, and we walk it with you before you get the keys back.

Common Questions

Bathroom Renovation
Questions — Brisbane

Everything homeowners ask us before signing off on a bathroom renovation.

Start Your Bathroom

A standard bathroom runs 2–3 weeks on site. Waterproofing needs curing time that cannot be rushed, and stone tops are templated after cabinetry goes in, so those two stages set the floor on the timeline. You receive a day-by-day schedule before we start.

Most full bathroom renovations land between $18,000 and $35,000 depending on the size of the room, whether the layout moves, and your tile and tapware selections. Relocating plumbing is the single biggest cost driver. Your quote is fixed before work begins.

No — the room is out of service from strip-out to handover. If it is your only bathroom we will sequence the job tightly and can talk through temporary options. Most clients with a second bathroom or ensuite carry on as normal.

Yes. Waterproofing is carried out by a licensed applicator to AS 3740, photographed at each coat, and you receive the compliance certificate on handover. Keep it with your house records — it matters at resale and for any future insurance claim.

In most cases, yes. Shower and vanity positions are usually straightforward. Moving a toilet depends on where the sewer connection sits and the fall available under the slab or floor — we confirm what is possible at the measure, before you commit to a layout.

You choose, we guide. We will send you a curated selection that suits your budget and the light in the room, and come with you to the supplier if that helps. Every selection is locked in before the strip-out so nothing stalls the job halfway through.